9778818威尼斯官网-vnsc3775威尼斯城官网

  • Completed No. 4 and No. 5 Berths

  • All 56 caissons are installed

  • Shipment of the first caisson

  • The last step of concrete pouring of the 56th caisson

  • First caisson placing

  • Completed oil berth

  • Driving of steel pipe piles at the oil berth

9778818威尼斯官网|vnsc3775威尼斯城官网

XML 地图 | Sitemap 地图